    Do I need completion certificate?

    We have spent eleven and a half months and tens of thousands of pounds converting our 3 storey Victorian house (we have lived in it for 6 years) into 3 self contained flats. We already have a tenant lined up for one flat and we will continue to live in another of the flats. Today the inspector from building control came round to check it was finished but he found loads of things which he said didn't meet regulations despite us getting everything checked and double checked with bith council and architect all the way through. Consequently he can't issue a completion certificate. As we have always lived here I can't see why I can't carry on living here without the certificate but can I rent out one of the flats without it? The things he said were stupid, for example an existing bathroom has a fullly opening window but he said we needed an extractor fan. I explained that it had a window and was an existing bathroom. He also said i needed self closing fire doors on every door on all three floors! This is ridiculous as we have a cat and can't possibly live like that. The architect had said we didn't need every doo to be done that way and I have seem many new apartments where the internal doors aren't all on self closures.

    My tenants are due to move in in just 2 days time. Are we renting ilegally? can anyone help with this as I am very worried

Latest Activity

Collapse

  • Reply to 5 Year Private Property Licence Ended After One Year
    by Always Problems
    I made a complaint to the ombudsman which was successful. My council was really annoyed as they had refused to show me a copy of a document and the Ombudsman forced them to send her a copy which she forwarded to me.
    09-07-2020, 16:07 PM
  • 5 Year Private Property Licence Ended After One Year
    by AKRS
    Hi All, I could really use some guidance in a matter relating to the above. We were told by our agency handling our property that we needed to obtain a licence through the council. I did my research and asked all the relevant questions and found out that the licence will cost 650 for five years. Sounds...
    29-06-2020, 10:03 AM
  • Planning permission
    by dizzymill
    I am wondering if anyone can answer my question please?

    There is a plot for sale in my area that has planning permission granted on it. The thing is, this was granted when the site was larger than it now is as the vendor has fenced a section of it off and built himself a log cabin style...
    07-07-2020, 18:58 PM
  • Reply to Planning permission
    by Always Problems
    In this case I would ask a Chartered Town Planner, Don't contact the council apart from looking on their Planning Portal
    09-07-2020, 16:03 PM
  • Reply to Planning permission
    by pilman
    The plans provided with the planning application will show the position and size of the house granted planning permission, as well as showing the extent of the land identified on the site plan.

    The planning permission would have taken into account the area available for garden, and parking...
    08-07-2020, 12:27 PM
  • Reply to Planning permission
    by dizzymill
    Hi Tipper. It was granted for one dwelling but vendor has since built the cabin and fenced off the plot he is selling saying it has planning. But the planning was granted for the original whole site before he built his cabin that he lives in .
    08-07-2020, 10:01 AM
  • Reply to Planning permission
    by Tipper
    It probably depends on what the permission was for and how many dwellings, etc.
    Also when pp was achieved as they run out after 3 years in most if not all cases.

    You can check on the local planning online to see the details, drawings, dates, etc.
    08-07-2020, 09:35 AM
  • Reply to Building Regulations Certificate
    by Tipper
    No not too late. We had the same situation for our three holiday lets.

    We pressed the installer to register the new boilers with Gas Safe who in turn send certification to the local Building Regs which is what they are supposed to do upon installation, assuming they are qualified and 'Gas...
    06-07-2020, 18:35 PM
  • Building Regulations Certificate
    by kennyj52
    Not sure if this is the correct forum for this, but what are the circumstances to obtain a Buildings Regulations Certificate? For example building a house, an extension, fitting a new boiler, installing a new light fitting, replacing a light bulb etc?
    I currently rent out 2 properties and own
    ...
    01-05-2020, 12:27 PM
  • Reply to Building Regulations Certificate
    by kennyj52
    Thanks for the advice all. I've had 2 boilers replaced by different installers over the last 6 years, but not received a Building Regulations Certificate from either one. I didn't ask the installers about it at the time as I was unaware of the need. Although they did provide Gas Safe Reports as requested,...
    05-07-2020, 12:27 PM
Working...