Builders working on commercial building

Collapse
X
  • Filter
  • Time
  • Show
Clear All
new posts

  • Builders working on commercial building

    Strange question.

    In my partnership, I don't deal with any builders/tradesmen when we have work done on the building, repairs, renovations etc. Generally, we agree something needs doing and a colleague arranges it all.

    I'm now frustrated as yet another piece of work has failed and the tradesman is awol and as he was paid in full there is 'nothing we can do' according to my colleague. To me, we are just throwing money away with no improvement to the problem.

    I was doing some research on a residential side and I came across some tips for when working with builders and want to know if it is common practice for this to be done in commercial side too (please excuse my naivety, as I said I focus on other areas).

    Signed Contract
    Schedule of works
    Fixed Price
    Retention 6 months

    At the moment, they just agree a price and works then pay in full at the end and it then goes to pot.

    My main interest is the contract and retention. Are the contracts usually the 'JCT' ones?

    What level is the rentention usually - 5%/10%?

    Not all our jobs are huge, some are just repairs - would you always insist on all the above on any job?

    Thanks in advance - I reallt want to get this sorted before I pull all my hair out...

    Q

  • #2
    You may have difficulty not payng in full after the work is done.

    Tradesmen either work for a company, and you can sue them
    ( drastic, I know, but that is an option )
    Or thay advertise in the local paper and are self employed, in
    which case, you make dam sure you have a verified home address
    where you can find them, even visit them on the premsis of,
    "Just passing and wondered when you may be able to start".

    If you are emplying workmen, and you cant contact them
    afterwards, I would tell your colleague to "Do better in future",
    or not at all, and you get the quotes.

    Comment


    • #3
      This is all very difficult and can really depend on the size of job. The schedule you set out above is a pretty standard schedule for most construction companies whatever they are working on, but this is really job related. If your doing a £50,000 job then you would expect this all to take place but if it is a £5000 job then many builders would be less happy about doing all of that for a small job.

      Same with retentions, these are usally on jobs that are rather big, usually over £100,000 from my experience. You can always ask for this schedule to take place but even things like fixed prices are difficult and depend on exactly what kind of work is taking place as prices will increase as sites are possibly dismantled and new jobs found. You really need to be working with someone who has experience who would help you and advise you.

      It will always be difficult if you have no site experience and do not understand the job which is being priced, value is not always the cheapest price and can be very dependent on what works you are getting done for the cost.

      Comment


      • #4
        Thanks for the replies - exactly what I was looking for.

        Hech - thanks for the indication of the scale of jobs these kind of practices are introduced on. Unless we have any major work done, it is likely these practices will not be required but there are a couple of long term plans that could require this.

        Ram - sound advice on the details I would ask him to get in the future as a back up. One of the lone guys disappeared right after he finished his work and it's been failing since. I'm just getting sick of paying out and the work not fixing the problems.

        I imagine it wouldn't be popular, but rather than the 6 month retention is the within reason to hold a proportion of payment while a snagging list is produced and payment made on completion of the snags (if they are reasonable)?

        Q

        Comment


        • #5
          Please give an example on a couple of the kinds of works you have had problems with and I will say whay I would do.

          Comment


          • #6
            Could you not just get a full written quote and then do staged payments to mitigate your losses? No need to undertake a schedule of works etc. It will put the cheaper builders off and cost you more long term.
            [I]The opinions I give are simply my opinions and interpretations of what I have learnt, in numerous years as a property professional, I would not rely upon them without consulting with a paid advisor and providing them with all the relevant facts[I]

            Comment


            • #7
              Originally posted by hech123 View Post
              Please give an example on a couple of the kinds of works you have had problems with and I will say whay I would do.
              Ok, the works with issues is a job to repair a series of serious leaks on an older property. The workman viewed the exterior using closely, said he identified the problem and re flashed a large section. It has made no difference to the water ingress to the top floor.

              Electrics - installation of full electrics (light,fuseboard, plugs) to series of self contained units. Found down the line they were not isolated from one another and they could trip each others elec off.

              MrJohnnyB - I would think it would be more difficult to get a builder to accept staged payments over a period where issues would become apparent - a few months after 'completion' of the job, rather than an agreed retainer. I don't know.

              Comment


              • #8
                Roof's are a constant nightmare and I have myself fixed 3-4 jobs on a roof and it still leaks, you really can not blame tradesmen for this as it really is a trial and error thing. I have one at the minute and have done 3 jobs, all of which need done and were in the correct area but still water is coming in, it can trickle donw from so many points and can be really hard to trace. If a roofer see's a problem they will try and fix it and you pay for there time, this does not always solve the problem and quite often it will not be the roofers fault.

                Electrics, if it is on a commercial property they would possibly not need isolated from one another as in a residential so may depend if you had requested this specificaly, the plugs and lights should be seperate as they have seperate load amounts at least, so a tricky one. It could even be argued that plugs and lights could be on the same dependiong which wire he has used.

                Small jobs like this are impossible to get retainers, you just got to check as best you can and pay the bill. Roof's are the worst job though and can be very difficult to fix!!

                Comment

                Latest Activity

                Collapse

                • Garage let on verbal agreement, three months rent unpaid
                  Jerseytina
                  Hi - I am new to this site, we have let out our garage without any agreement in place, only verbal. The tenant has not paid for 3 months and is refusing to communicate although he is picking up messages. Are we legally entitled to sell the contacts of the garage which includes a car!

                  Thank...
                  17-07-2017, 11:47 AM
                • Reply to Garage let on verbal agreement, three months rent unpaid
                  islandgirl
                  Bet you don't need to go any further than sending the letter (2 post offices, cert of posting from each just to be belt and braces in case you do have to do so). The person will surface red faced and angry as soon as he gets the letter. Just ensure he can't get the stuff in the garage until you have...
                  20-07-2017, 17:36 PM
                • Commercial rent review, expert report
                  desamax
                  Hi i am in the process of a rent review being done by an independent valuer. They have requested the below statement. I am representing myself on this occasion, can anyone advise the best way for me to compile with the request to be my own expert witness and complete the below to satisfaction?
                  ...
                  13-07-2017, 13:55 PM
                • Reply to Commercial rent review, expert report
                  desamax
                  Hi again, I need to draw up an " Agreed statement of facts" on the property and the comparable properties.
                  I obtained the information on my properties sq m from the vendors agent and the VOA web site, that was exactly the same size wise .
                  I obtained the comparable properties info...
                  20-07-2017, 14:49 PM
                • Reply to Garage let on verbal agreement, three months rent unpaid
                  ram
                  See Guide_to_tenants_possessions_left_at_property__LLS _.pdf
                  http://www.landlordlegalsolutions.co...erty__LLS_.pdf

                  Torts starts on page 3.
                  Because you should be able to change the lock, and take possession of building for notified rent arrears, you then have possession of everything
                  ...
                  20-07-2017, 13:50 PM
                • Reply to Garage let on verbal agreement, three months rent unpaid
                  islandgirl
                  Send a torts interference with goods notice to the person - find the legal wording and explain that if goods not moved by a certain date you will sell them and use the proceeds to pay unpaid rent for the garage etc. Anything left over will be returned to the tenant after all costs. Usually this makes...
                  20-07-2017, 12:39 PM
                • Tenant with environmental health issues.
                  superstardeejay
                  We rent out light industrial units and empty, enclosed yards to small businesses. Recently we took on a tenant who runs a skip-hire business. They have 2 skip lorries and a bunch of skips. Filled skips are brought back to site and the rubbish sorted, and taken to the scrap yard.

                  THe...
                  07-07-2017, 16:04 PM
                • Reply to Tenant with environmental health issues.
                  islandgirl
                  Ah ok sorry to hear that. I thought they might have some kind of machinery you could serve a tort notice on. All I can suggest is writing to them to give them a certain length of time to clear the skips (you would have to allow entry just for this) and telling them that if it is not done you will do...
                  20-07-2017, 12:36 PM
                • Reply to Tenant with environmental health issues.
                  superstardeejay
                  There's no building, it's a yard. Currently there are around 30 skips full of stinking rubbish and quite a bit strewn around the yard....
                  20-07-2017, 08:51 AM
                • Reply to Garage let on verbal agreement, three months rent unpaid
                  ram
                  As no one has answered.

                  No you cannot sell someone elses property.
                  When you say it's your garage, where is it, as you are in Commercial Property questions

                  Is it your house garage ?, Is it your leasehold flat garage ( which you cant let out )
                  Or is it your business
                  ...
                  20-07-2017, 08:23 AM
                Working...
                X